20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier

E£949.00
FREE Shipping

20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier

  • Brand: Unbranded

20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier

  • Brand: Unbranded
RRP: E£1,599.00
Price: E£949.00
You save: E£650.00 (40%)
Sold by:
E£949.00
FREE Shipping

In stock

We accept the following payment methods

Description

Features 1、High quality electrolytic capacitors with stable performance 2、The specifications of the capacitors is marked on its surface, convenient to use 3、Heat resisting, low leakage, low loss and low impedance 4、Great choice for electronic professionals or enthusiasts 5、Suitable for a wide range of electronic applications Specification Features: High quality electrolytic capacitors with stable performance. The specifications of the capacitors is marked on its surface, convenient to use. Heat resisting, low leakage, low loss and low impedance. Great choice for electronic professionals or enthusiasts. Suitable for a wide range of electronic applications. Specifications: Working Voltage: DC 450V Surge voltage: DC 500V Value: 22uf Capacitance Tolerance: ±20% Operating temperature: 105℃ Dissipation Factor: <0.24 at 20℃/120Hz Dimensions: Approx. 21 x 13mm / 0.83 x 0.51in Lead type length: Tin plating copper layer Lead length: 27mm / 1.1inch Type: Polarized Quantity: 20pcs Weight: Approx. 79g Package Included: 20 x Electrolytic Capacitor Package List
  • Fruugo ID: 342854705-751389177
  • EAN: 6117160221825

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Product Safety Labels

CE Mark
Safety Warnings: Please do not allow your child to handle this product alone to avoid swallowing or other injuries; adult supervision is recommended.

Delivery & Returns

Dispatched within 2 days

  • STANDARD: FREE - Delivery between Thu 02 October 2025–Wed 08 October 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy